About us
General information
Appeal of the management
Work in the company
Company resources
Our clients
Lisences and Certificates
Reviews
Media center
Contact us
A range of company
Anti-corrosive protection of metal structures
Thermal insulation of equipment and pipelines
Assembling of equipment and pipelines
Shutdown maintenance
Rope access
Repair of reservoirs and major pipelines
Geography of facilities
Development
About us
A range of company
Geography of facilities
Media center
Development
Contact us
About us
General information
Appeal of the management
Work in the company
Company resources
Our clients
Lisences and Certificates
Reviews
A range of company
Anti-corrosive protection of metal structures
Thermal insulation of equipment and pipelines
Assembling of equipment and pipelines
Shutdown maintenance
Rope access
Repair of reservoirs and major pipelines
+375 29 1-503-503
+7 499 403-38-58
menu
RU
PL
+375 29 1-503-503
+7 499 403-38-58
Главная
Блог
MEDIA CENTER
Elimination of defects of the bottom of the TVS-1000
15 March 2019
Elimination of defects of the bottom of the TVS-1000 with non-destructive testing of welded joints
Maintenance of an antenna mast structure for OJSC «Gazprom Transgaz Belarus»
5 November 2018
Maintenance of an antenna mast structure and corrosion-resistant coating of the towers was renewed
Diagnostic activities at OJSC «Gomel Chemical Plant»
29 October 2018
Diagnostic activities at OJSC «Gomel Chemical Plant»
Anti-corrosive protection and thermal insulation of pipelines at OJSC «Mozyr Oil Refinery»
20 July 2018
Construction and assembling works project: «Heavy Residue Hydrocracking Unit Complex. An integrated Hydrocracking Unit. OJSC «Mozyr Oil Refinery».
Construction and assembling works at OJSC «Mogilevkhimvolokno»
8 May 2018
Reconstructing the cooling tower No 6 of the water recycling system of DMT-4 of the Water Supply and Sewerage Department of the chief power engineer of OJSC «Mogilevkhimvolokno»
+375 29 1-503-503
+7 499 403-38-58